Fig. 6

Edge posterior probabilities when the proposal distribution proposes two steps with probability 0.5 and normal one step with probability 0.5. Edge posterior probabilities were calculated from four different MCMC chains (chains 1 to 4 in Fig. 5) and compared to each other